«Submission to the Commission of Energy Regulation from the Irish Home Builders Association / Construction Industry Federation, June 1st 2006 ...»

-- [ Page 1 ] --

Cer06/119

Submission to the Commission of Energy Regulation from the Irish Home

Builders Association / Construction Industry Federation, June 1st 2006

Introduction

The IHBA / CIF was astounded to hear that the Commission of Energy Regulation

(CER) has proposed a 67% increase in connection charges sought by ESB Networks

for domestic scheme developments, 27% for commercial developments and 27% for

domestic non-scheme developments. There are a number of different issues that

make this proposed increase both ill-timed and ill-advised.

The IHBA has worked with ESB Networks over the last 18 months in order to help smooth the transition for the deregulation of the energy supply market and the separation of the different ESB sectors such as supply and networks. The increase in cost to the developer is completely out of line with any comparable industry inflation or indices such as the House Building Cost Index.

What has disappointed the IHBA / CIF and its members greatly is the lack of transparency and consultation time available to discuss the proposal. Following publication of the proposed changes there were only another 11 days before the close of consultation. The IHBA / CIF is however grateful for this belated opportunity to address the issues that have arisen from these proposed increases. The following are the main points that the IHBA / CIF feel should be considered by the CER prior to agreeing to any increase in charges.

1. Previous Discussions Following discussions with the CER in February 2005, the IHBA were informed that connection charges may be increased so as to recoup up to 50% of the actual cost during up to 2010. Clarification arose on foot of IHBA members being quoted increases between 260% and 300% from prices that were typical in early 2005.

After this meeting with the regulator, the prices dropped again to the norm and in some cases members were reissued with more realistic quotes. It is with this meeting in mind that the increase of 67% is seen as excessive in the extreme.

2. Delays and Poor Service Quality The current quality of service provided by ESB Networks is nothing short of appalling and is costing the industry massive amounts of money in delays. Due to the monopoly the ESB Networks enjoys in the network sector, it is plain to see why there is an unfair advantage. As a result, members of the IHBA have been held to ransom while the service levels of ESB Networks continue on a downward spiral. While the industry suffers greatly from this uncompetitive scenario, it is very difficult to justify increases of 67% in capital contributions sought. The logic Cer06/119 of poorer service levels with increased capital contributions is baffling and requires some justification.

The proposed levels of increase have the effect of penalising members of the IHBA on two counts. Firstly with a huge impact on capital contributions and secondly the costs borne by developers due to the delay in connecting developments to the grid. While the current level of service exists from ESB Networks, the IHBA suggests that the CER should freeze any concept of an increase in connection charges as sought by ESB Networks The IHBA could see some sort of logic if a phased implementation of increased charges was linked in an accountable manner to some obvious increase in the quality of service provided by ESB Networks but this is plainly not the case in this instance.

3. Transparency of the Cost Having retained an independent Quantity Surveyor to look at the document CER 06/084 “Charges for connection to the Distribution System”, the IHBA cannot understand how these proposed increases were arrived at. The breakdown of 5% for inflation, 25% for increase to 50% recoupment of costs and 37% for increased trenching charges does not give any real explanation as to how these figures were calculated.

Firstly, as was mentioned earlier, the IHBA has received no explanation as to why there has been a u-turn on the phased increase to 50% costs up to 2010 that was mentioned by the CER in February 2005. There is certainly no explanation in the above-mentioned document.

Secondly, as can be seen in the correspondence received from the independent Quantity Surveyor, Mr. Basil Conroy, there is no definition as to what a trenching charge entails. There are no depth or width parameters that would allow comparison of the increase of changes proposed. This is merely an example of the lack of transparency that is the basis for these latest increases.

4. Front Loading of ESB Networks’ Infrastructure Another aspect of the current design demands of ESB Networks relates to the Sub-station construction. This is in effect front-loading the infrastructure of ESB Networks. While it may be acknowledged as planning for the future the cost is borne by the developer without mention of any compensation. This scenario is aided by the fact that ESB Networks is in effect a monopoly and can demand whatever design parameters it desires.

As was mentioned in our meeting with the CER on Thursday the 18th of May 2006 the specification and capacity of these substations has increased by ESB Networks out of all order and fails to compare in any manner with the relative increase in energy demand over the last number of years. Where, in the past, ESB Networks requested plinths as substations they now demand rooms or buildings which require planning permission.





Cer06/119

5. Logic of Increases The IHBA also wishes to question the logic that the largest increases should be forced upon the scheme housing. Surely this is the most cost effective and sustainable manner of development where ESB Networks are concerned with less material and labour costs than one-off developments. Why then there is a requirement to increase costs by the order of 67% seems completely illogical especially when 25% if this increase is related directly to trenching charges. Could it be that ESB Networks feel that the best way to increase profits is to target the largest proportion of development types in the country i.e. the domestic scheme development? The IHBA / CIF is opposed to any increase in any of the different sectors mentioned is the circular from the CER i.e. commercial, non-scheme domestic and scheme-domestic.

6. Lack of Consultation The main customers of ESB Networks are members of the IHBA specifically and the CIF generally. The IHBA / CIF are disappointed that they were not consulted on a more formal basis to discuss these possible price increases. This is exasperated by the fact that it was the IHBA in January 2005 who approached ESB Networks to come to some arrangement with regard to procedures going forward. The continued poor quality of service provided by ESB Networks make it difficult to come to agreement but none the less information was distributed to IHBA members with regard to market opening for energy supply and the introduction of Meter Point Registration Numbers (MPRNs).

7. Regulatory Capture As can be seen from the attached correspondence received from Mr. Basil Conroy the document Cer06/084 contains very little in the way of Cost Breakdown. The breakdown of these charges is a vital requirement for two reasons.

Firstly, the developer should be able to calculate with some degree of accuracy the capital contributions that he will be required to pay prior to starting a development. This is achievable if one is working with a breakdown that can be used by a Q.S. to determine overall price. Secondly, it makes it very difficult for members or indeed the CER to examine the capital contributions in a transparent and open manner and hence to query the costs.

In the instance of the IHBA / CIF this is a worry going forward in terms of business decisions and procurement of sites. For the CER it raises the issue of “Regulatory Capture” where the entity that they are regulating is also the only source of information. This would certainly appear to be what has occurred in this case as the document gives no explanation as to how the totals are reached.

The most typical symptom of regulatory capture is when the Regulating Body comes to decisions that side very closely with the objectives of the entity it is regulating. It would seem that this is certainly the case with this latest document

which:

- Does not include a breakdown of costs

- Grants a decision that will boost the revenue of ESB Networks Cer06/119

- Refuses to take into account the poor quality of service provided by ESB Networks

8. Customer Charter ESB Networks currently has in place a Customer Charter which is frequently broken due to current poor levels service. In March 2005 the IHBA was informed by ESB Networks that they would be working within the boundaries of this Charter towards the end of 2005. This is not the case in the vast majority of instances and due to the derisory penalties that the Charter applies it means that ESB Networks are not compelled to improve their customer service. The position of ESB Networks as a monopoly should mean that any Customer Charter should have real implications for the company if standards of service fall to levels experienced by CIF members over the last number of years.

9. Recent Increases Over the last number of years members of the IHBA have experienced increases in capital contributions on similar type schemes without any justification. This undermines the decision to add 5% onto capital contributions from 2004 figures.

There has been evidence that costs per unit have increased by significant amounts but it is not known how these increases have been determined, as the methodology for calculation is not known.

10. Future Consultation As mentioned earlier the IHBA CIF as main customers of ESB Networks would appreciate consultation on further developments in this particular sector of energy supply and any other developments that may have such serious implications for their businesses.

While at the meeting with the CER on May 18th last it was mentioned that your office intends to investigate the quality or service provided by ESB Networks in the near future. The IHBA / CIF wishes to be consulted to provide empirical information that will describe some of the instances of poor quality of service as discussed in an informal and anecdotal manner during our last meeting. The poor quality of service not only impact on the business of our members but also has an effect on their reputation going forward.

Cer06/119 Recommendations (i) Increases to ESB connection charges must be deferred pending a full independent examination of the basis of the calculation of the charges and the current cost of connection. No increase should be envisaged without meaningful consultation with the construction industry on whom these charges are levied.

(ii) No increase in charges should be approved by the CER without clear independent evidence of improved customer service delivery by ESB Networks.

CIF/IHBA welcomes the opportunity to undertake meaningful dialogue with the CER and ESB on current levels of customer service and measures for improvement.

(iii) Any proposed increase in charges should be linked with reference to movement the DoEHLG House Building Cost Index.

(iv) No increase should be permitted at the cost to the developer and subsequently the home purchaser.

(v) Regulatory measures limiting the demands of ESB Networks on developers to build capital infrastructure including on-site sub-stations should be introduced prior to CER approving any increase in charges for ESB Networks.

(vi) The CER should request that the ESB Networks Customer Charter is a meaningful document with real penalties for poor quality of service. This is especially required due to the fact that ESB Networks are essentially operating as a monopoly.

Cer06/119 APPENDIX Correspondence received from independent Quantity Surveyor Mr. Basil Conroy of Basil Conroy & Co. Chartered Surveyors following inspection of the documents

Charges for Connection to the Distribution System © ESB 05/05/2006 ref:

Cer06/084 and Charges for Connection to the Distribution System © ESB 26/05/4 Correspondence 1

–  –  –

Dear Kevin, Further to our discussions on the above I now confirm that I have received your email containing the 38 page document issued by ESB Networks and titled “Charges for Connection to the Distribution System”, Revision 5, dated 2nd May 2006, (Status:awaiting CER approval).

I’ve gone through the said document and speaking as a Quantity Surveyor, I have to say it is very long winded, highly technical and involves very little in the way of Cost Breakdown which I, as a QS, can comment on in terms of the charges being value for money or otherwise. (Please note, I am making the assumption that the document was supposed to offer this type of cost breakdown) There are many spreadsheets and diagrams such as:MV/HV network charge

2. Domestic non scheme Connection charges

3. Domestic scheme Connection charges

4. Business demand customer connection charges

5. Network charges and trenching charges (see also below)

6. Refunds in respect of shared network etc All of these are in high-tech, hard-to-understand terminology. The information is of little use in terms of compiling a report on the reasonableness or otherwise of the charges.

Cer06/119 The only one crumb of information I could find was under Table A8: MV Network Charges and Trenching Charges whereby a rate of €140.52 applied to roads and paths and a rate of €43.54 applied to grass. I take it these are the costs of digging trenches in both of these situations, however no detail was given of the width of the trench, the depth of the trench, the finish treatment of the trench, what back filling was to be used, whether the pipe was supplied and installed by the ESB or the builder, what size ducting was to be provided and whether it was in a public or private area etc etc.

Hence these two items of information cannot be even commented on in terms of their market value.

I do accept that certain lump sum prices were quoted, for instance Business demand customer connection charges relating to various KV connections etc. However, how these final quoted figures were arrived at still remains a complete mystery and I would suggest that the ESB forward fairly basic and simple information, for instance, in relation to the trenches mentioned above, answering all the questions I raised and quoting an individual rate for each of the trade items in question.



Pages:   || 2 |


Similar works:

«Territory Analysis with Mixed Models and Clustering Eric J. Weibel and J. Paul Walsh Abstract Motivation. Territory as it is currently implemented is not a causal rating variable. The actual causal forces that drive the geographical loss generating process (LGP) do so in a complicated manner. Both the loss cost gradient (LCG) and information density (largely driven by the geographical density of exposures and by loss frequency) can change rapidly, and at different rates and in different...»

«LOVE ACROSS THE SALT DESERT K. N. Daruwalla The Rann of Kutch is a vast, lonely desert, almost impossible to cross. Yet, some people do cross it for reasons of their own. Najab Hussain also crossed the vast desert for a very special reason. What was it?1. THE DROUGHT in Kutch had lasted for three successive years. Even when clouds were sighted they passed by, ignoring the stricken country. The monsoons had, so to speak, forgotten to land. The Rann lay like a paralysed monster, its back covered...»

«Does a long-term personal relationship between an auditor and a client invoke conscious misjudgements or unconscious biases? An experimental analysis Abstract The persisting familiarity threat of auditors continuously raises regulatory concerns, which are reflected in a recently proposed compulsory audit firm rotation in the European Commission Green Paper. The aim of this paper is to shed light on auditors’ cognitive drivers of bias inherent in a long-term personal relationship with the...»

«OPTIMALIZACE ZÁSOBOVÁNÍ VODOU A ZPĚTNÉHO VYUŽITÍ PŘEČIŠTĚNÝCH ODPADNÍCH VOD ZA VYUŽITÍ INOVATIVNÍCH TECHNOLOGIÍ ŘEŠITELSKÝ TÝM: Ing. Miloš Horák Ing. Josef Miklík RNDr. Katuše Kubíková Praha, září 2010 | 2 Obsah 1 ÚVOD 2 OBECNÁ ČÁST 2.1 MOBILNÍ EXPERIMENTÁLNÍ STANICE MES 2.2 OPTIMALIZACE CYKLU VYUŽÍVÁNÍ VODNÍCH ZDROJŮ 2.2.1 Úpravna pitné vody alfa 2.2.2 ČOV anaerobní reaktor s biofiltrem a aerobním pískovým filtrem 2.2.3 Zavlažovací systém...»

«References Albarracin-Jordan, Juan V.1992. Prehispanic and early Colonial settlement patterns in the Lower Tiwanaku Valley, Bolivia. Unpublished Ph.D. dissertation, Department of Anthropology, Southern Methodist University. Ann Arbor: University Microfilms.1996. Tiwanku: Arqueologia regional y dinamica segmentaria. La Paz: Plural editores.. Albarracin-Jordan, Juan V., and James Edward Mathews 1990. Asentamientos prehispanicos del valle de Tiwanaku Vol. 1. La Paz: Producciones Cima. Alconini...»

«Mr. Mike Jones dedicates this book to: His mom Dot, son Chris, daughter Stephanie, Carl Woodall and Sylvia Payne Mr. David Angier dedicates this book to: His mom Helen, who never got enough credit Mr. Greg Wilson dedicates this book to: His Savior Jesus, his children Jessica & Miranda Wilson, his mom Darla, grandmother Nita, Dad Glen and sister Beth Contents Preface “Come on in.” Chapter 1 1 Chapter 2 The Father and the Son 5 Chapter 3 Detective Mike Jones 10 Chapter 4 The Death of Gene...»

«Excerpted from: Aldarondo, E. & Mederos, F. (Eds.) (2002). Men Who Batter: Intervention And Prevention Strategies In A Diverse Society. NY: Civic Research Institute. Ch. 2, pps. 1-20. Common Practitioners’ Concerns about Abusive Men Etiony Aldarondo, Ph.D. Fernando Mederos, Ed.D. During the past several years we have had the opportunity to interact with many advocates, batterer intervention workers, clinicians, judges, police, and probation officers working to end domestic violence. Their...»

«Assessor’s Guidelines for the SVQ 4 in Care Services Leadership and Management SCQF level 10 (GJ9V 24) Publication date: December 2014 Publication code: DB6185 The information in this publication may be reproduced in support of SQA qualifications. If it is reproduced, SQA should be clearly acknowledged as the source. If it is to be used for any other purpose, then written permission must be obtained from the Support Materials Development Officer at SQA. It must not be reproduced for trade or...»

«Security Now! Transcript of Episode #574 Page 1 of 28 Transcript of Episode #574 Routers & Micro Kernels Description: This week, Leo and I catch up with the past week's news. Did the Shadow Brokers hack the NSA's Equation Group? Apple's Bug Bounty gets quickly outbid. A critical flaw is discovered in the RNG of GnuPG. The EFF weighs in on Windows 10. The Chrome browser is frightening people unnecessarily. A Johns Hopkins team of cryptographers, including Matthew Green, disclose a weakness in...»

«May 2010 Exposure Draft ED/2010/5 Presentation of Items of Other Comprehensive Income Proposed amendments to IAS 1 Comments to be received by 30 September 2010 Exposure Draft Presentation of Items of Other Comprehensive Income (proposed amendments to IAS 1) Comments to be received by 30 September 2010 ED/2010/5 This exposure draft Presentation of Items of Other Comprehensive Income is published by the International Accounting Standards Board (IASB) for comment only. The proposals may be...»

«ESTRANGED NIGHTINGALES: ON POETRY WRITTEN BY NEAR EASTERN JEWS IN ISRAEL by LEV HAKAK University of California, Los Angeles, 90024 I. Introduction While poetry written by Near Eastern Jews in Israel generally follows the forms of Israeli poetry in general, their poetry does not simply emulate the writing of Israeli poets of European origin; rather, it sometimes introduces unique settings, themes and metaphoric language drawn from the specific background of poets of Near Eastern background. It...»

«WOMEN, GENDER AND DEVELOPMENT IN THE PACIFIC: KEY ISSUES Women and Gender Mainstreaming Introduction: Women and gender mainstreaming Pamela Thomas Mainstreaming: The Pacific experience Lorraine Corner What lies at the heart of the failure of gender mainstreaming: The strategy or the implementation? Suzette Mitchell Women transforming the mainstream — a think piece Lorraine Corner Transformational development and the wellbeing of women Elizabeth Reid Whose World? The Bank on gender Deb Foskey...»





 
<<  HOME   |    CONTACTS
2016 www.dissertation.xlibx.info - Dissertations, online materials

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.